Jacket production

Eton jacket

 

 

 

Eton Systems has over 50 installations for suit jacket production worldwide. Eton Systems in the suit industries is a flexible material handling system designed Eton jacket 1to eliminate manual transportation and minimize handling. It increases productivity radically, ensures an optimal working flow and provides time for adding value to your products.

 

 

 

 

Jacket production data example:

 

PRODUCTION   DATA BEFORE   ETON WITH ETON
Production/8 hours  387  500
Number   of operations on Eton, incl. loading and quality check  16
Need   of operators on Eton  30
Production   increase  38%
Through   put time 10   days  1,2   day

 

Average results with Eton Systems in Suit jacket production:

Productivity  increase:                  30%
Return on investment:                2,7 years
Through put time:                         4 days
Example of special advantages: The Eton select software
keeps the customized orders together and makes it easy to plan and
control the production. The systems also give an easy overview of the
production. The double clamp makes it easy to fit in the large amount of
parts for a suit jacket.

Eton jacket clamp

ETON systems jacket 6 Eton jacket 5 Eton jacket 3Eton jacket 4

Eton jacket layout