Jacket production
Eton Systems has over 50 installations for suit jacket production worldwide. Eton Systems in the suit industries is a flexible material handling system designed to eliminate manual transportation and minimize handling. It increases productivity radically, ensures an optimal working flow and provides time for adding value to your products.
Jacket production data example:
PRODUCTION DATA | BEFORE ETON | WITH ETON |
Production/8 hours | 387 | 500 |
Number of operations on Eton, incl. loading and quality check | 16 | |
Need of operators on Eton | 30 | |
Production increase | 38% | |
Through put time | 10 days | 1,2 day |
Average results with Eton Systems in Suit jacket production:
Productivity increase: 30%
Return on investment: 2,7 years
Through put time: 4 days
Example of special advantages: The Eton select software
keeps the customized orders together and makes it easy to plan and
control the production. The systems also give an easy overview of the
production. The double clamp makes it easy to fit in the large amount of
parts for a suit jacket.